We partner with renewable energy developers to deliver specialized demolition and site preparation services that support the full project lifecycle. From decommissioning existing structures to clearing and grading sites for new development, our crews bring the experience and safety standards required for complex energy projects.
EXPERT DEMOLITION SERVICES FOR RENEWABLE ENERGY PROJECTS
RESPONSIBLE DEMOLITION THAT MAXIMIZES MATERIAL RECOVERY & REUSE
Total Wrecking & Environmental provides comprehensive demolition that includes site preparation and material recovery services for renewable energy projects nationwide.
From solar and wind to battery storage and legacy energy transitions, we bring the same disciplined, safety-first approach that has made us a trusted leader in industrial demolition. With the equipment and experience to operate anywhere in the U.S., Total Wrecking is equipped to support renewable developers efficiently.
Our crews have worked across the full renewable energy spectrum, including:
• Solar Farms
• Wind Energy Projects
• Coal-to-renewable Conversions
• Battery Energy Storage Systems (BESS)
• Legacy Energy Plant Transitions
FULL-SCOPE SOLUTIONS
ADVANCED RECYCLING
We transform hard-to-recycle materials into environmentally sound and economically viable solutions. We are specialized in even the hardest to deal with materials including:
• Wind turbine blades
• Fiberglass components
• Specialized renewable infrastructure materials
DEMOLITION & SITE PREPARATION
• Full-spectrum demolition tailored for renewable energy structures
• Land clearing and grading designed for solar, wind, and storage sites
• Safe removal of utilities and existing energy infrastructure
• Preparing sites specifically for renewable construction and redevelopment
HAZARDOUS & REGULATED MATERIALS MANAGEMENT
We handle hazardous materials with the same disciplined approach used on all regulated demolition projects. Our teams are experienced environmental stewards who safely and securely manage:
• PCB-containing materials
• Heavy metals
• Legacy industrial hazards
SPECIALIZED EQUIPMENT & TECHNOLOGY
We utilize both standard demolition equipment and specialized tools designed specifically for renewable energy materials, including:
• Cutting and shredding systems
• Equipment for downsizing wind turbine blades
• Specialized transport solutions for non-traditional materials
Some of this equipment is purpose-built for renewable energy work and not used in legacy demolition projects.
SPECIALIZED WIND TURBINE DEMOLITION
Wind turbine removal presents unique logistical and site challenges, particularly on active wind farms or constrained sites where demolition must be executed around live, operating assets. This includes spaces with tight site footprints, weather-dependent work windows, or a number of other site-specific conditions.
Unlike many contractors, Total Wrecking & Environmental offers multiple specialized methods for turbine takedown, allowing us to select the safest and most efficient approach for each project.
Where conditions allow, we perform controlled base takedown methods. When spacing, access, or infrastructure limit traditional approaches, we deploy advanced robotic demolition to precisely dismantle turbine structures while preserving the existing base, eliminating full foundation replacement and delivering significant time and cost savings.
OUR RENEWABLE ENERGY EXPERIENCE
• Solar energy sites
• Wind energy projects
• Coal-to-renewable conversions
• Battery storage facilities
• Legacy plant transitions
• Large-scale site preparation projects
“As we near the completion of the IRP fuel tank removal project, I wanted to express my gratitude to the Total team for their exceptional diligence and strong work ethic throughout this endeavor. I have only positive feedback to share regarding the entire team, and I’m pleased to note that the OUC site manager shares my sentiments.”
Matt Kalish
Project Engineer OUC
WHAT WE DO
Clearing Today for a Better Tomorrow
SAFETY FIRST
OSHA Compliant
ZERO OSHA VIOLATIONS
Our experienced team keeps up-to-date with the latest contracting, regulatory and environmental methods and machinery and adheres to every OSHA, EPA, federal, state, and local protocol to guarantee the safest possible industrial demolition and environmental abatement.

SAFETY FIRST
Emergency Response Trained
EXCEPTIONAL SAFETY STANDARDS & PROTOCOLS
At Total Wrecking, there is nothing more important than safety on a national demolition or environmental abatement project. That’s why we’ve implemented additional company protocols to further ensure the highest safety standards on our job sites.

SAFETY FIRST
First Aid/CPR/AED Trained
IN-HOUSE SAFETY PROGRAM
We conduct our operations safely by promoting actions and security policies well beyond what is required by construction industry standards, like first-response training and first-Aid/AED/CPR training.

SAFETY FIRST
Safety Trained
SAFETY IS OUR #1 PRIORITY
Our superior safety record is a result of extensive preparation, a professional and industry-leading safety program, and high quality performance every step of the way.

